
Suspended LED Display for an Exhibition Stand: Belize Tourism Board at WTM London 2026
How a three-sided suspended DRE Series LED display with convex corners and a 1.25 mm portrait LED wall were rigged for the Belize stand at WTM London 2026.

How a three-sided suspended DRE Series LED display with convex corners and a 1.25 mm portrait LED wall were rigged for the Belize stand at WTM London 2026.

How a 2,976 x 1,984 mm DRE Series LED wall was confirmed on a Saturday, installed on the Sunday and live for the Ibiza stand at WTM London 2026 by the Tuesday.

How Dynamo built a 360 LED room at BAT’s London HQ: a 34.72 m DRE Series P1.93 media wall wrapping the whole room, with content by partner Pixel Artworks.

How Dynamo built a double-sided LED wall and two concave flexible LED screens into a rotating Ralph Lauren podium at Galeries Lafayette Paris.

How Dynamo designed and installed a 35 m, 1.95 mm trading floor LED ticker along the ceiling line of PIMCO’s new London office at 25 Baker Street.

How a 22.5 sq m U-shaped hanging LED banner and a 3 m x 2 m fine-pitch booth wall gave the Biotech stand a beacon and a close-up wall at ESCRS 2026 in London.

LED sphere hire, an interactive 86-inch Holobox and a transparent mesh LED poster, staged by Dynamo at UEFA’s headquarters for a sports marketing agency.

How Dynamo delivered a DRE Series P1.29 rental LED wall with live PIP dance-challenge compositing, concealed audio and a printed timber stand for Korea Tourism Organization’s BTS activation at Outernet London.

Case study: How Dynamo LED Displays delivered a five-zone headquarters LED installation at AutoTrader’s new Manchester HQ, including a compound-curved ribbon, live data ticker, and interactive AI wall. Partner: Pixel Artworks. January 2026.

Dynamo LED Displays built a permanent L-shaped LED marketing suite in Mayfair for Westminster Tower, using DEX Series 2.06mm panels across a 9.424m wall and

How we installed a 24 mยฒ DX Series P1.9 COB LED video wall at Hotel Londres, Caracas. Specification, logistics, and 2.5-day install by 3 engineers.

At exhibitions, attention is earned in seconds. In this case study, we explain how we delivered a rightโangle (Lโshape) LED feature wall for Shindaiwa at